All minerals
    GOES
    Electrical Steel (GOES)
    TightBase metals & gridEssential

    Electrical Steel (GOES)

    Grain-oriented electrical steel forms the magnetic cores of power transformers — a chronic bottleneck in grid build-out. Listed by the US DOE as a critical material.

    Supply risk index
    41
    / 100
    Top producer
    n/a
    China share
    n/a
    US import reliance
    —
    World output 2025
    W / n.a.
    On national lists
    1 / 10

    Supply chain by step

    China's share of world output at each step, from the mine to the grain-oriented electrical steel. A step can be far more concentrated than the mine that feeds it.

    Processing gap: +52 points. China's share rises from 11% at the mine to 64% at the ironmaking step.
    1. 1Mine
      Mining
      Iron ore (iron content)
      11%China
      Leaders: Australia 38% · Brazil 16% · India 12%
      2025Official statistics
    2. 2Separation / refining
      Ironmaking
      Pig iron
      64%China
      Leaders: India 8% · Japan 5%
      2025Official statisticsChokepoint
    3. 3Metal / material
      Steelmaking
      Raw steel (all grades)
      52%China
      Leaders: India 8% · United States 4%
      2025Official statistics
    4. 4Finished product
      Electrical steel
      Grain-oriented electrical steel (GOES) for transformer cores
      Not tracked yet
    • Electrical steel: Very few producers make GOES. The site lists it as tight; country shares are not published in a reusable source.
    Electrical Steel (GOES) alerts

    Know first when electrical steel (goes) supply shifts.

    One free email each Sunday with the week's export controls, list changes and price moves, including anything that affects electrical steel (goes).

    See a sample issue

    No spam. One-click unsubscribe in every email.

    Why it matters for AI infrastructure
    Essential — Directly inside chips, optics, servers or the grid buildout

    Every new AI campus needs large power transformers; a 2026 Resources Policy study identifies GOES as a particularly constrained enabling material for AI data centers.

    Tight / restricted
    Price spikes, export controls or active disruption

    Transformer lead times and limited GOES capacity are a recognized constraint for AI build-out.

    Who calls it critical

    Membership on each government list. “Strategic” marks a higher tier where the list has one; “group” means included as part of a group such as rare earths or PGMs.

    DOE
    United States (DOE)
    U.S. Department of Energy · 2023
    critical
    US
    United States
    Not listed
    EU
    European Union
    Not listed
    GB
    United Kingdom
    Not listed
    CN
    China
    Not listed
    JP
    Japan
    Not listed
    KR
    South Korea
    Not listed
    IN
    India
    Not listed
    AU
    Australia
    Not listed
    CA
    Canada
    Not listed

    Listed exposure to electrical steel (goes)

    Public companies and funds that produce, refine or hold electrical steel (goes). Not investment advice.

    Investment thesis

    Electrical Steel (GOES): key questions

    Where is electrical steel (goes) mined or produced?
    Country-level production data for Electrical Steel (GOES) is limited or withheld in USGS statistics.
    Who processes electrical steel (goes) after it is mined?
    Ironmaking (pig iron): China 64% (2025); Steelmaking (raw steel (all grades)): China 52% (2025). That is a processing gap of 52 percentage points over China's 11% share of mining.
    Is electrical steel (goes) a critical mineral?
    Electrical Steel (GOES) appears on 1 of the 10 official lists we track (United States (DOE)).
    Is electrical steel (goes) in short supply?
    Our supply status: Tight / restricted. Transformer lead times and limited GOES capacity are a recognized constraint for AI build-out.
    Why does electrical steel (goes) matter for AI infrastructure?
    Every new AI campus needs large power transformers; a 2026 Resources Policy study identifies GOES as a particularly constrained enabling material for AI data centers.